The market provides the opportunity. How much of it becomes real revenue depends on whether the storage system executes the commands on site – on time, precisely and without interruption. In this article we show, with numbers, where the revenue of an aggregated battery storage system disappears and what a local controller changes.
Executive summary (PDF)BST Control Box product page
The starting point: what a 1 MW / 2 MWh storage can earn
Modelling the Hungarian day-ahead (DAM) and aFRR market prices of August 2026, the potential revenue of a 1 MW / 2 MWh storage was 12,448 EUR/MW/month – assuming 96% availability. That is the theoretical ceiling the aggregator can bid for. Everything below depends on the site.
Same storage, same market – different result
Based on the experience of a project we examined, the real availability of a storage system is typically 80–90% – it varies by project. Revenue scales linearly with availability, so the same storage on the same market earns:
| Scenario | Availability | Revenue (EUR/MW/month) |
|---|---|---|
| Potential (model) | 96% | 12,448 |
| Estimated reality | 80–90% | 10,374–11,670 |
| With BST Control Box (target) | 95% | 12,319 |
The difference between the estimated reality and the 95% target is 650–1,950 EUR/MW per month – 7,800–23,350 EUR per MW per year, or 2.8–8.5 million HUF. Not because the market changed, but because the site executed better.
Where does the revenue go – and what does a local controller do about it?
The aggregator decides on the bids and sends the baseline signal. A local controller – in our case the BST Control Box – executes it on site, protects the system and documents what happened. The two complement each other. Six typical loss points:
| Where is revenue lost? | What happens? | What does the BST Control Box do? |
|---|---|---|
| Communication loss | The link to the aggregator drops; the storage stands still or produces wrongly. | Watchdog: after 3–4 missed periods it alarms and switches to local fallback mode. Own UPS and LTE router. |
| Slow or imprecise execution | aFRR activation requires second-level tracking; peak prices bring the most. | Executes the baseline locally and immediately towards the PCS; sends measured data back to the aggregator. |
| Exceeding the contractual limit | Exceeding the connection contract means penalties or disconnection. | Stepped protection: curtail above 110%, BESS breaker after 20 s above 110%, main breaker above 120%. |
| Settlement disputes | Hard to prove afterwards what the aggregator requested and what really happened. | Time-stamped log of every aggregator command and of the actual execution. |
| Battery degradation | Too deep discharge and exceeding BMS limits shorten the lifetime. | SoC protection chain: discharge block, emergency charge, commands clipped to BMS limits. |
| Troubleshooting, downtime | Every hour of standstill is lost capacity and activation revenue. | Remote monitoring (ComAp AirGate), event log and alarms at PV, BESS, grid and communication level. |
How much is this worth on your storage?
Raising availability from 80–90% to 95% is worth the following surplus, calculated from the same starting point (lower value from 90%, upper value from 80% starting availability):
| Storage | Surplus / month (EUR) | Surplus / year (EUR) | Surplus / year (HUF) | Payback of the Control Box |
|---|---|---|---|---|
| 1 MW / 2 MWh | 650–1,950 | 7,800–23,350 | 2.8–8.5 M | 7–24 months |
| 2 MW / 4 MWh | 1,300–3,900 | 15,550–46,700 | 5.7–17.0 M | 4–11 months |
| 4 MW / 8 MWh | 2,600–7,800 | 31,100–93,350 | 11.4–34.1 M | 2–5 months |
The BST Control Box is a ComAp InteliNeo-based outdoor energy management cabinet (IP54, −15…+50 °C) with UPS and LTE router; the logic is programmed for each site according to the grid connection contract. Price: 4,980,000 HUF + VAT, monitoring 29,990 HUF/month. Payback is calculated with one Control Box, after deducting the monthly monitoring fee; larger sites are sized individually.
Works with any aggregator – and without one
- Standard Modbus TCP connection to the aggregator; when you change aggregator, the local control stays.
- Manufacturer-independent: 9 inverter/PCS manufacturers and 8 ComAp units – Sinexcel, Kehua, EVE, Huawei, CATL, Delta among others.
- Also for hybrid sites: PV curtailment, peak-load management, diesel genset, black start.
- Without an aggregator: schedule- and time-based control for self-consumption sites.
The calculation is illustrative, not an investment offer. Starting point: potential revenue modelled from the Hungarian DAM and aFRR prices of August 2026 (at 96% availability), scaled linearly with availability; the 80–90% starting range is an estimate; 365 HUF/EUR. Actual revenue depends on the site, the connection contract, the aggregator agreement and market prices.
Let us calculate it for your storage system