- Storage next to a solar plant: handling export limits, shifting production, optimising feed-in tariff or market sales.
- Grid services: frequency regulation and reserve markets, in cooperation with an aggregator.
- Large industrial sites: peak shaving and reserve at megawatt scale.
- Plant hybridisation: existing generating units combined with storage.
System architecture
1. Battery containersCATL TENER (6.25 MWh), TENER S, EnerC+; EVE Mr. Giant (5 MWh), Mr. Giant 3.0 (6.9 MWh); Sunnic EnerX. LFP cells, liquid cooling, 10,000+ cycles.
2. Power conversion (PCS)Sinexcel PWS1/PWX1 and StellaON, Kehua BCS, Delta PCS1500 / PCSC / PCS3450 – from 500 kW to 6.9 MW.
3. MV connectionSinexcel 20 ft MV station, Delta PCST5500 (22/33 kV), Kehua and Delta MV skids – with transformer and switchgear.
4. Control and EMSComAp InteliNeo 6000/5500, InteliMains, InteliGateway; BST Control Box.
Our scope in the project
- Preliminary sizing and payback estimate.
- Support for permitting and grid-connection technical documentation.
- Equipment procurement and logistics.
- Integration and control programming.
- FAT/SAT and commissioning.
- Remote monitoring, warranty and post-warranty support.
References
Kunfehértó – ~8 MWp PV + BESS (13 solar plants) · Szentmártonkáta 2.44 MWh · Abasár – commissioning and control programming (ComAp InteliNeo 5500). Our references →