BST Control Box – Optimum

The controller that finally makes your solar plant and battery work together

Outdoor control cabinet built on the ComAp InteliNeo controller family. One unit brings together the grid connection, the BESS, the PV inverters and the generator – delivered as a finished product, at a fixed price, within 14 days.

HUF 4,980,000 + VAT

30 minutes with an engineer – free of charge Download datasheet (PDF)

The problem it solves

More and more solar plants are being paired with battery storage – and more and more owners find that the system looks good on paper but barely performs in practice. It does not follow prices, it fights with the inverters, the manufacturer's controller is a closed box, and nobody can tell what happened at 2 a.m.

The fault is rarely in the battery. It is almost always in the control. The Control Box is our engineering answer to this problem.

What is in the box?

ComAp InteliNeo controller

ComAp's 4th-generation hybrid microgrid controller family (InteliNeo 530 BESS, 5500, 6000); the Optimum version uses the InteliNeo 5500. Thousands of installations worldwide.

Teltonika RUT901 LTE router + AirGate

Secure, encrypted remote access through the ComAp cloud.

UPS

The controller keeps running and logging during a grid outage.

Relay bank

Breaker and aggregator commands.

Current and voltage measurement

L1–L3 CT inputs, grid and generation side.

Main I/O terminal strip

24 V, E-Stop, 8 binary inputs, 6 relay outputs, 2 CAN, RS485. Pre-wired, labelled and tested – only the external cables need to be connected on site.

What does it control at the same time?

Source / deviceWhat the Control Box does with itSupported manufacturers
Grid (Mains) + STStransfer automation, import limit, import/export limitation (reverse power)–
BESS + PCScharge/discharge, SoC management, protection functionsSinexcel, Kehua, EVE, Huawei
PV inverterssetpoint, curtailment, PV/BESS maximisationHuawei, SMA, Fronius, etc.
Diesel or gas generatorSoC-based start/stop, load sharing, minimum loadCummins, Perkins, Boudin, etc.
Wind turbine, cogenerationsetpoint, curtailment, heat-led operation–
Loadspriority, load limitation, EV charger control–

Up to 9 inverters/PCS and 8 further ComAp controllers (on CAN bus) can be managed simultaneously.

Two operating modes, one cabinet

Grid-parallel (MPTM)

Peak shaving, peak shifting, export limit compliance, following aggregator instructions.

Island mode (MINT)

Seamless transfer on grid outage, SoC-based generator start, the plant keeps producing.

What only BST gives you: control logic tuned to your plant

Anyone can buy an InteliNeo. What makes the Control Box different is that our engineers program the control logic for your specific plant, in a freely programmable PLC layer, based on your grid connection agreement, your storage and your production profile.

  • You do not get a generic factory setting, but a strategy tuned to your own plant.
  • Every control action can be traced back afterwards in the log.
  • If the agreement changes or the plant is extended, the logic changes – not the hardware.

When is the Control Box the right solution?

1. Adding storage to an existing plant

The Control Box also takes over the existing inverters, so the BESS comes under a single control.

2. You have storage, but it does not work properly

The Control Box replaces the closed manufacturer controller; the hardware stays, the logic is replaced.

3. Low utilisation

A new charging strategy so the battery becomes a revenue-generating asset.

4. Hybrid site with a generator

SoC-based start, minimum run time, less diesel.

Technical data

ControllerComAp InteliNeo 5500 (Optimum version); InteliNeo 530 BESS or 6000 on request
Dimensions800 × 600 × 260 mm
Weight34 kg (40 kg with UPS batteries)
Rated voltage230 V AC / 24 V DC
Rated / max. operating current1.1 A / 4 A
CommunicationRS485 (Modbus RTU), Ethernet (Modbus TCP), CAN, LTE
Protection ratingIP54, outdoor
Operating temperature−15 °C … +50 °C
Earthing systemTN-S, protection class I
Impulse withstand voltage2000 V AC
Short-circuit strength6000 A

Monitoring: WebSupervisor – online monitoring, statistics and reports from any browser. InteliSCADA – local SCADA integration. AirGate – encrypted remote access for BST engineers for remote diagnostics, without a site visit.

Price and delivery

HUF 4,980,000 + VAT

For energy storage projects with a valid building permit, invoicing is subject to the Hungarian reverse-charge VAT mechanism. Delivery time: approximately 14 days from order.

The price includes: the fully equipped cabinet, the InteliNeo 5500 controller, the LTE router, the UPS, and the development of the control logic tuned to your plant.

For larger or more complex sites we offer an InteliNeo 6000-based version, and for simple storage applications an InteliNeo 530 BESS-based version, on a project basis.

30 minutes with an engineer – free of charge Download datasheet (PDF)

Frequently asked questions

Does it work with my existing inverters?

Yes, if they support Modbus RTU/TCP or SunSpec communication – which covers the vast majority of inverters on the market.

Who commissions it?

BST's engineering team, with a factory acceptance test (FAT) and a site acceptance test (SAT).

What if the plant is extended later?

The logic changes, the cabinet stays. Expandable to 9 inverters and 8 further ComAp units.

Does it need internet?

The LTE router is built in; it can also connect to your own network via Ethernet.